A closeup of B-22's port side moments after the SBD was hoisted from the waters of Lake Michigan in September 1994. The large, circular outline of the life raft hatch is visible in the fuselage just beside the rightmost numeral "2" in the side code. The noticeable traces of rust around its edges are a harbinger for the corrosion which Pioneer Aero's engineers found on the hatch mount when they opened up the airframe. Steel parts had caused galvanic corrosion in the aluminum wherever they touched. (image via A&T Recovery)
A closeup of B-22's port side moments after the SBD was hoisted from the waters of Lake Michigan in September 1994. The large, circular outline of the life raft hatch is visible in the fuselage just beside the rightmost numeral "2" in the side code. The noticeable traces of rust around its edges are a harbinger for the corrosion which Pioneer Aero's engineers found on the hatch mount when they opened up the airframe. Steel parts had caused galvanic corrosion in the aluminum wherever they touched. (image via A&T Recovery)

Overview:

The Dauntless, like most US naval aircraft in WWII, held an inflatable life raft stowed aboard for surviving aircrew to use in the case of an emergency water landing. The compartment which houses this raft on the SBD is a tubular structure with an access door on the lefthand side of the fuselage just behind the rear gunner's cockpit, as seen in the image above showing B-22's port side shortly after the aircraft's 1994 salvage from Lake Michigan. Pioneer Aero's engineers recently began working on this section of the airframe, with this article focusing on their effort to restore both the mounting rings which attach the Life Raft Compartment tube to the fuselage and the tube itself.

An illustration from page 93 of the SBD-6 Erection & Maintenance Manual showing the open hatch to the emergency life raft compartment on the fuselage. The tube attaches to the airframe via mounting rings riveted to either side of the fuselage, one of them being visible in this depiction.
An illustration from page 93 of the SBD-6 Erection & Maintenance Manual showing the open hatch to the emergency life raft compartment on the fuselage. The tube attaches to the airframe via mounting rings riveted to either side of the fuselage, one of them being visible in this depiction.

Mounting Rings:

The SBD's Life Raft Compartment tube is supported by two mounting rings, one on either side of the fuselage. The lefthand mount is formed from a single piece of aluminum, since the door opening is on that side of the airframe. Meanwhile, the righthand example is actually split into several sections to allow fuselage stringers to pass through it uninterrupted. When Martin Hedley examined B-22's original mounts, he found unrepairable corrosion in several areas on the port-side example, likely exacerbated by the presence of steel door fittings, not to mention the abrasive effects of the door chafing against its surface over time. The righthand mount, however, had not been subjected to such trauma and required only minimal repairs to bring it up to airworthy condition.

A view of the lefthand mounting ring for B-22's Life Raft Compartment tube temporarily re-fitted earlier this year for information gathering and setup purposes. (image via Pioneer Aero Ltd.)
A view of the lefthand mounting ring for B-22's Life Raft Compartment tube temporarily re-fitted earlier this year for information gathering and setup purposes. (image via Pioneer Aero Ltd.)

Given the corrosion, it was clear that B-22's lefthand mounting ring needed a replacement. While an apparently near-perfect example was available via a donor airframe, closer inspection revealed significant cracks in a couple of places which rendered it beyond airworthy repair, sadly. As a result, Martin Hedley had to refabricate the lefthand ring from scratch. For such a seemingly innocuous component, the process to make a new one required significant endeavor due to the part's complex curvature.

A view of B-22's original lefthand mounting ring for the Life Raft Compartment tube alongside an example from a donor airframe. As should be obvious, B-22's ring is badly damaged—indeed some of the lower face has been corroded away completely. While the donor ring to its right initially appeared to be in restorable condition, however, closer inspection revealed that the two areas where the compartment door once fretted against the ring were cracked, rendering the part beyond airworthy repair. (image via Pioneer Aero Ltd.)
A view of B-22's original lefthand mounting ring for the Life Raft Compartment tube alongside an example from a donor airframe. As should be obvious, B-22's ring is badly damaged—indeed some of the lower face has been corroded away completely. While the donor ring to its right initially appeared to be in restorable condition, however, closer inspection revealed that the two areas where the compartment door once fretted against the ring were cracked, rendering the part beyond airworthy repair. (image via Pioneer Aero Ltd.)

Hedley had to create a custom forming block with which to shape a new part from a fresh aluminum blank. To create this forming block, he had to first obtain the necessary dimensions, which the available manufacturing drawings did not provide in sufficient detail. He therefore had to cleco the appropriate original skin section back onto the upper fuselage frames in their jig, then create a 3D-scan of the relevant area to get the proper profile for the CAD drawing, before adding the 13" diameter circular hole to it which marked out the mounting ring's inner diameter within the Life Raft Compartment door opening. With that data, he could then cut out the forming block from a hunk of MDF using a CNC router, in a manner described in previous articles.

The Douglas Aircraft Company's manufacturing drawing for the SBD's Life Raft Compartment assembly. The assembly itself is part number 580682, with each of the individual parts having their own 'dash number'. For instance, the lefthand mounting ring is part number 582680-6. If you look carefully, while many of that component's dimensions are described in the drawing, its outer profile is simply described as "form to contour of ship - see drawing #581477 BT-1, #580075 for XBT-2 & 5060887 for SBD-1" ... where the BT-1 was the US Navy designation for the SBD's Northrop-designed predecessor, which Douglas later transformed into the Dauntless.
The Douglas Aircraft Company's manufacturing drawing for the SBD's Life Raft Compartment assembly. The assembly itself is part number 580682, with each of the individual parts having their own 'dash number'. For instance, the lefthand mounting ring is part number 582680-6. If you look carefully, while many of that component's dimensions are described in the drawing, its outer profile is simply described as "form to contour of ship - see drawing #581477 BT-1, #580075 for XBT-2 & 5060887 for SBD-1" ... where the BT-1 was the US Navy designation for the SBD's Northrop-designed predecessor, which Douglas later transformed into the Dauntless.
A gorgeous color image of a Northrop BT-1 belonging to VB-6 aboard USS Enterprise (CV 6) during exercises off Hawaii circa September 1940. The BT-1's similarities to the Douglas SBD Dauntless are more than coincidental, since the legendary E.H. Heinemann was chief designer for both types, first at Northrop and also after Douglas Aircraft bought out the remaining 49% of Jack Northrop's shares in his compandy during 1938. The design for the SBD's Life Raft Compartment started out with the one used in the BT-1, as intimated in the preceding drawing. Interestingly, just over a year after this image was captured, SBD's from this  same unit and carrier were the first American aircraft to attack Imperial Japanese forces on Maloelap Atoll in the Marshall Islands, where the Museum's Mitsubishi A6M3 Model 32 Zero was later based. (image by Carl Mydans image for Life Magazine)
A gorgeous color image of a Northrop BT-1 belonging to VB-6 aboard USS Enterprise (CV 6) during exercises off Hawaii circa September 1940. The BT-1's similarities to the Douglas SBD Dauntless are more than coincidental, since the legendary E.H. Heinemann was chief designer for both types, first at Northrop and also after Douglas Aircraft bought out the remaining 49% of Jack Northrop's shares in his compandy during 1938. The design for the SBD's Life Raft Compartment started out with the one used in the BT-1, as intimated in the preceding drawing. Interestingly, just over a year after this image was captured, SBD's from this same unit and carrier were the first American aircraft to attack Imperial Japanese forces on Maloelap Atoll in the Marshall Islands, where the Museum's Mitsubishi A6M3 Model 32 Zero was later based. (image by Carl Mydans image for Life Magazine)
The partially completed forming block which Pioneer Aero made to fabricate a replacement lefthand mounting ring for the Life Raft Compartment tube. To get the precise shape, they had to first 3D-scan the fuselage at the appropriate position, then add a circle of the required diameter, in the correct location at the correct angle relative to the skin. That information allowed the team to create a drawing from which the forming block could be milled out, using the same techniques described in previous updates. The forming block, as pictured here, still needed to have a .25" radius sanded off around the edge of the circle. The center also needed hollowing out to provide room for swinging a planishing hammer. For reference, the forming block is sitting in the same attitude as the fuselage normally would. Note that the Life Raft Compartment tube is visible in the background to the right of the forming block. (image via Pioneer Aero Ltd.)
The partially completed forming block which Pioneer Aero made to fabricate a replacement lefthand mounting ring for the Life Raft Compartment tube. To get the precise shape, they had to first 3D-scan the fuselage at the appropriate position, then add a circle of the required diameter, in the correct location at the correct angle relative to the skin. That information allowed the team to create a drawing from which the forming block could be milled out, using the same techniques described in previous updates. The forming block, as pictured here, still needed to have a .25" radius sanded off around the edge of the circle. The center also needed hollowing out to provide room for swinging a planishing hammer. For reference, the forming block is sitting in the same attitude as the fuselage normally would. Note that the Life Raft Compartment tube is visible in the background to the right of the forming block. (image via Pioneer Aero Ltd.)

The Forming Process:

With the forming block completed, Martin Hedley then cut out a blank for the new part from a sheet of 2024-T0 aluminum, which he then screwed down onto the block to begin the shaping process. He selected the aluminum alloy in its softest state to reduce the possibility of any cracking while he hammered it into the correct profile since the part featured complex curves and sharp bend radii.

This image shows the aluminum alloy blank for the replacement lefthand Life Raft Compartment mounting ring in the process of being hammered into shape over the forming block. Note that the blank has been screwed down to ensure it does not move. At the time this image was captured, Martin Hedley was stretching the blank’s inner edge downwards into the forming block in even stages to provide an even amount of stretching around the circle. For reference, in this image, the ring’s physical lower edge is actually at the top of the frame. (image via Pioneer Aero Ltd.)
This image shows the aluminum alloy blank for the replacement lefthand Life Raft Compartment mounting ring in the process of being hammered into shape over the forming block. Note that the blank has been screwed down to ensure it does not move. At the time this image was captured, Martin Hedley was stretching the blank’s inner edge downwards into the forming block in even stages to provide an even amount of stretching around the circle. For reference, in this image, the ring’s physical lower edge is actually at the top of the frame. (image via Pioneer Aero Ltd.)

Trial-Fitting:

After completing the shaping process, it was time for Martin Hedley to trim the part to its correct size and trial-fit it to the SBD's upper fuselage in its jig. With the part clamped in the correct position against the original, non-airworthy skin, Hedley then drilled the rivet holes into the part, using the original skin as a template to perform this work. He had to delay drilling a handful of these holes along the part's lower edge, of course, because the old skin had corroded completely away in that position. The formal position of those holes will be determined at a later date. After the trial-fitting took place, Hedley returned the part to the forming block to make a few minor tweaks to its structure. The part was then ready for trial-fitting against the tube structure before heading out to another shop for heat treatment to bring the part up to the correct strength and hardness.

In this image we see that the replacement mounting ring has been trimmed to size and clamped against the fuselage skin to allow trial-fitting and the drilling of rivet holes to take place. Note that the latter is nearly complete, barring a few holes along the lower edge where the original skin had rotted away. The missing holes will be plotted and drilled in at a later date. (image via Pioneer Aero Ltd.)
In this image we see that the replacement mounting ring has been trimmed to size and clamped against the fuselage skin to allow trial-fitting and the drilling of rivet holes to take place. Note that the latter is nearly complete, barring a few holes along the lower edge where the original skin had rotted away. The missing holes will be plotted and drilled in at a later date. (image via Pioneer Aero Ltd.)
The replacement lefthand Life Raft Compartment mounting ring following its completion. It has been drilled and trimmed to the final dimensions but is back on the forming block for a final minor tweet in its shape. The ring is now ready for heat treating. For reference, in this image, the ring’s lower edge sits at the bottom of the frame. (image via Pioneer Aero Ltd.)
The replacement lefthand Life Raft Compartment mounting ring following its completion. It has been drilled and trimmed to the final dimensions but is back on the forming block for a final minor tweet in its shape. The ring is now ready for heat treating. For reference, in this image, the ring’s lower edge sits at the bottom of the frame. (image via Pioneer Aero Ltd.)

Remanufacturing the Life Raft Compartment Tube:

The cylindrical structure which forms the stowage tube for the Life Raft Compartment comprises two sections of sheet aluminum, of roughly similar size, curved into the appropriate shape and spot welded together along each seam. Unfortunately, corrosion damaged both parts of B-22's original unit in several key areas, rendering them beyond airworthy repair, so Martin Hedley had to fabricate replacements, rolling out the two halves from 2024-T3 aluminum sheet. He was able to use the higher strength alloy, because the parts in question featured no tight bends or areas of significant shrinking/stretching in their remanufacture. Using the original parts as a template, Hedley was able to trim and drill off the edges which attach to the mounting ring on the righthand side.

A closeup from the earlier drawing showing dimensions for the notches along the righthand side of the tube (see Detail B) to allow two stringers to pass uninterrupted along the righthand side of the fuselage.
A closeup from the earlier drawing showing dimensions for the notches along the righthand side of the tube (see Detail B) to allow two stringers to pass uninterrupted along the righthand side of the fuselage.
The righthand end of the Life Raft Compartment tube with its mounting ring segments clecoed against its two sheet metal sections during trial-fitting. The tube’s two semicylindrical sheet metal sections were temporarily taped to each other across the seams at this point. Note that the righthand mounting ring is separated into segments to allow two fuselage stringers to pass through the compartment assembly. (image via Pioneer Aero Ltd.)
The righthand end of the Life Raft Compartment tube with its mounting ring segments clecoed against its two sheet metal sections during trial-fitting. The tube’s two semicylindrical sheet metal sections were temporarily taped to each other across the seams at this point. Note that the righthand mounting ring is separated into segments to allow two fuselage stringers to pass through the compartment assembly. (image via Pioneer Aero Ltd.)

The process of drilling off the tube's lefthand edges against the associated mounting ring took place while trial-fitting the Life Raft Compartment assembly in the SBD's upper fuselage jig. It was then time to mark off and trim the excess aluminum from the tube's lefthand edge so that a roughly 1/4" distance lay between it and the mounting ring opening, thus providing the necessary gap for the Compartment's door when it closes).

A view of the lefthand end of the life raft tube during trial-fitting. Note that the mounting ring has been drilled off against the tube, at this point, although the two semicylindrical sections are still taped together and await drilling off. Furthermore, excess tube material still protrudes from the mounting ring, but it would soon be marked off and trimmed. (image via Pioneer Aero Ltd.)
A view of the lefthand end of the life raft tube during trial-fitting. Note that the mounting ring has been drilled off against the tube, at this point, although the two semicylindrical sections are still taped together and await drilling off. Furthermore, excess tube material still protrudes from the mounting ring, but it would soon be marked off and trimmed. (image via Pioneer Aero Ltd.)

With the two semicylindrical sheet aluminum tube sections clecoed against their mounting rings, Hedley was then able to drill off the rivet holes along the seams where they meet. While Douglas Aircraft originally designed these components for spot welding together, as already mentioned, rivet-fastening is an acceptable substitute. Furthermore, it will make final assembly far easier, considering the specialized spot welding machine which Hedley would otherwise have needed for reaching inside the long tube to produce those central joins. The Life Raft Compartment assembly parts were then all ready for heat treating (in the case of the lefthand mounting ring) and primer-painting for eventual final assembly.

Another view of the lefthand side of the Life Raft Compartment assembly, this time after the excess tube material has been trimmed back to the mounting ring’s outer lip. Looking carefully along that orifice, you can see the black line inked onto the tube about 1/4” back from its outer edge. The tube material was soon trimmed to that line to make space for the Compartment’s door to close. Note that the seams between the tube’s two semicylindrical sections have been drilled off against one another and clecoed tightly into place. (image via Pioneer Aero Ltd.)
Another view of the lefthand side of the Life Raft Compartment assembly, this time after the excess tube material has been trimmed back to the mounting ring’s outer lip. Looking carefully along that orifice, you can see the black line inked onto the tube about 1/4” back from its outer edge. The tube material was soon trimmed to that line to make space for the Compartment’s door to close. Note that the seams between the tube’s two semicylindrical sections have been drilled off against one another and clecoed tightly into place. (image via Pioneer Aero Ltd.)