Overview:

This is a brief followup to Restoration Update No.102 which covered the restoration of our SBD's parachute flare dispenser. At the conclusion of the previous article, Pioneer Aero's engineers had completed overhauling/refabricating and painting its set of components, with a majority of these parts being original to B-22. It was now time to rivet everything together in preparation for installing the dispenser in the Dauntless once the rebuild of its fuselage is completed.

Riveting:

Pioneer's chief engineer, Martin Hedley, was responsible for reassembling the parachute flare dispenser, first clecoing all of the parts together and then replacing the clecoes, one-by-one, with rivets. This was a more complex task than might be imagined, because the domed head for each rivet penetrating a flare canister cavity had to line its interior wall. Douglas Aircraft designed the assembly this way to minimize the chance that a flare might snag against a rivet either during loading or deployment. Accomplishing this, involved 'back-riveting', with the rivet gun's set hammering against the tails to flatten them, while the rivet head was supported with a special tool which could reached inside the canister (a process described more fully in Update No.109).

After riveting the flare dispenser assembly together as far as was practical, Hedley applied a further coat of paint to both cover the rivets and provide a more even distribution over the entire structure. With this completed, the parachute flare dispenser reentered storage to await re-installation in the fuselage once that is structurally complete.

The following images illustrate the process described above.

This image shows the parachute flare canisters during the final assembly process.  Note that the lower rings have been back-riveted in place; the heads being located within the canister interior to minimize the possibility that a flare could snag on them during either the loading or deployment phase. Refer to the recent life raft compartment article (Update No.109) for a more detailed description of what back-riveting involves. The empty holes between the rings are where the lower door hinge brackets will fit. (image via Pioneer Aero Ltd.)
This image shows the parachute flare canisters during the final assembly process. Note that the lower rings have been back-riveted in place; the heads being located within the canister interior to minimize the possibility that a flare could snag on them during either the loading or deployment phase. Refer to the recent life raft compartment article (Update No.109) for a more detailed description of what back-riveting involves. The empty holes between the rings are where the lower door hinge brackets will fit. (image via Pioneer Aero Ltd.)
A closeup of the parachute flare canisters after they have been riveted together. If you look carefully, you can see that the heads for the rivets holding the lower rings in place are positioned on the canister interiors. As already noted, Douglas chose this approach to limit any chance of snags during flare loading or deployment. (image via Pioneer Aero Ltd.)
A closeup of the parachute flare canisters after they have been riveted together. If you look carefully, you can see that the heads for the rivets holding the lower rings in place are positioned on the canister interiors. As already noted, Douglas chose this approach to limit any chance of snags during flare loading or deployment. (image via Pioneer Aero Ltd.)
A view of the parachute flare dispenser’s outboard face following its final assembly. Martin Hedley riveted it all together as far as practical. It now awaits re-installation in the SBD’s rear fuselage once that is back together again. Hedley applied another layer of top coat paint after shooting the rivets to cover their tails and provide a more even distribution. (image via Pioneer Aero Ltd.)
A view of the parachute flare dispenser’s outboard face following its final assembly. Martin Hedley riveted it all together as far as practical. It now awaits re-installation in the SBD’s rear fuselage once that is back together again. Hedley applied another layer of top coat paint after shooting the rivets to cover their tails and provide a more even distribution. (image via Pioneer Aero Ltd.)