Overview:
With Pioneer Aero's Craig Cunha and Doug Brown having begun permanently riveting the SBD's Wing Center Section together, as covered in the previous restoration update, it was time for Rod Hanson to start forming and installing plumbing for the various systems which run through the airframe. This includes lines for the hydraulic, fuel, electrical and indicating systems. This article will cover the first steps in this process.
Landing Gear Position Indicator Conduits:
While it may seem innocuous-looking at first glance, especially given its location in the cockpit just outboard of the lefthand rudder pedal support, the SBD's landing gear position indicator plays an important role in flight safety. As the image reveals, the gauge shows the positional status of each main undercarriage leg: up, down, or somewhere in between!
Unlike most modern aircraft, the spring-loaded indicators on this gauge are directly connected by cables (actually solid wires) to each undercarriage leg. So when a gear leg cycles up or down, the corresponding indicator's spot on the gauge face precisely tracks the given leg's physical position. As a result, unless a cable is severed, the pilot will always know whether the aircraft's undercarriage is in the correct position for the desired flight operation.
The landing gear position indicator cables reach down from the cockpit into the Wing Center Section and then run out to their respective landing gear legs through a dedicated conduit, one for each cable. These conduits are formed from metal tubing, and fabricated much like other aircraft plumbing. They run most of their length along the rear face of Spar #1 and help ensure the cables don't snag on anything during their operation. Pioneer Aero's Rod Hanson refabricated and installed these two conduits for our Dauntless, with the following images describing some of his work.
With the ribs between Spars #1 and #2 riveted in place, it was time to install the conduits for main landing gear leg position indicator cables. The conduit is clamped securely at locations running along the rear face of Spar #1, while the solid wire which runs within it attaches directly to the gear leg at one end, and the indicator in the cockpit. As each leg moves so does its corresponding indicator. This image shows the righthand conduit (pale silver tube) after Rod Hanson had passed it through the appropriate apertures in each rib. While the brackets for securing it to the airframe are in position, the conduit was still hanging freely at the time this image was captured. (image via Pioneer Aero Ltd.)
Main Undercarriage Brake Lines:
While Rod Hanson was working on the landing gear leg position indicator conduits, he also began fabricating and installing hydraulic brake lines for the main undercarriage. The sections he installed run from the swivel joint attached to the rear face of the Nose Spar and trace along that spar into the wheel well. The following images describe some of Hanson's efforts in this area.
A view of the brake line plumbing running through the lefthand wheel well. The brake line follows the nose spar inboard and passes through the ribs as required. It is designed and fabricated in sections to allow easy fitment and removal - note the blue-anodized fittings dotted along its length. (image via Pioneer Aero Ltd.)