Overview:
With our most recent post describing the Museum's Douglas SBD-5 Dauntless and its journey back to flying condition, we covered Pioneer Aero's efforts to repair/refabricate and trial-fit the last remaining parts which the dive-bomber's Wing Center Section needed before the team could begin permanently riveting and bolting together this critical subassembly. This article will cover the first steps in the latter process. Exciting times!
Assembly Order:
Any readers who have built a plastic model kit or even an IKEA furniture flatpack will be all too aware of how important it is to assemble the parts in precisely the correct order; getting anything glued or screwed together out of sequence can involve a lot hair pulling and, likely, a fair amount of swearing too!
Now imagine reassembling something as complex as the SBD's Wing Center Section... any errors here will likely incur significant delays and cost overruns to correct, and may even involve the replacement and/or refabrication of certain components if unbolting or drilling them apart causes any damage.
Unlike model kits or IKEA furniture, however, the Dauntless no longer comes with a set of plans outlining its reassembly order. While such documents would certainly have existed at the Douglas Aircraft plants in El Segundo, California and Oklahoma City, Oklahoma during the period when they built SBDs, little if any of that critical information has survived to the present day. Pioneer Aero's personnel had to figure these details out on their own...
Consequently, the first task which Martin Hedley and Craig Cunha had to complete before they could permanently reassemble the Wing Center Section involved creating a detailed riveting order document. They conducted this effort while the SBD's Wing Center Section remained temporarily pinned together on its jig following the recently completed trial-fitting process. The document helped ensure that Pioneer's engineers could reach both sides of each rivet as performed the final assembly process.
Preparations for Final Assembly:
For obvious reasons, it made sense to perform the final assembly in stages, moving progressively from the forward spars on back. To begin, Pioneer's engineers removed all of the wing structure forward of Spar #2 from the jig. After unpinning the temporary fasteners (e.g. clecoes) holding these components together, each part received a new coat of paint: either insignia white if it was visible in the wheel well, or green primer if it was internal structure. The latter paint resembled the hue and finish of the original zinc chromate primer used in WWII, (note: zinc chromate paint is no longer available for general use due to the highly toxic and carcinogenic nature of the hexavalent chromium originally used in its manufacture). Of course, due to accessibility issues, it made sense to final-rivet some Wing Center Section subassemblies together while they were off the jig, as shown in the following images.
The lower lefthand engine mount stiffener assembly in the process of being riveted together. This component and its righthand counterpart will be riveted to the SBD’s Wing Center Section later in the assembly sequence. (image via Pioneer Aero Ltd.)
A closeup of the as-yet unpainted lower lefthand engine mount bolted temporally to the lower engine mount stiffener assembly. The mount will be riveted to the stiffener once the stiffener itself is riveted to the SBD’s Wing Center Section later in the assembly sequence. (image via Pioneer Aero Ltd.)
Final Assembly Begins:
Once the paint had cured, the restoration team reinstalled Spar #1 in the Wing Center Section jig. They then began clecoing the forward wing structure to it, including the leading edge subassemblies, the ribs linking the nose spars to Spar #1, and the lower forward fuselage structure. From here, various other structural parts were refitted awaiting the moment when they could be riveted together in the appropriate order. The following images show how the newly-painted parts went back onto the jig in preparation for final-riveting.
Following a coat of “zinc chromate” paint, Spar#1 is seen here refitted into the Wing Center Section jig, ready for final assembly to begin, a significant project milestone! Spar #2 and the structure aft of it remain in the jig for the moment to help align the ribs which link it to Spar #1. (image via Pioneer Aero Ltd.)
Spar #1 is seen here in the Wing Center Section jig with its leading edges clecoed to it following painting. Soon after this image was captured, Pioneer’s engineers began riveting the subassemblies together. (image via Pioneer Aero Ltd.)
A lower lefthand side view of Spar #1 and its associated wing leading edge assembly clecoed together in the Wing Center Section jig in preparation for final riveting. Note that the wheel well areas are painted white. (image via Pioneer Aero Ltd.)
A similar view to the previous image, but this time showing the righthand side of Spar #1 and its associated wing leading edge assembly mounted in the SBD's Wing Center Section jig. The ribs between the nose spars and Spar #1 are ready to be riveted to the upper wing skin and Spar #1. (image via Pioneer Aero Ltd.)
This image of Spar #1 and the wing leading edges clecoed together in the Wing Center Section jig demonstrates how having Spar #2 remain (temporarily) in the jig helped align the ribs linking it to Spar #1 so that they remained in the correct position during final-riveting. (image via Pioneer Aero Ltd.)
Riveting Begins:
Once everything forward of Wing Spar #2 had received its final interior coats of paint and been clecoed back together on the jig, it was time to begin riveting it all together. The two images below show Pioneer's Craig Cunha on the rivet gun and Doug Brown on the bucking bar (sometimes called a dolly) forming rivets to attach a rib to Spar #1. A pair of videos demonstrating their operating procedures (from either side) follows immediately afterwards.
Following the videos, a series of images shows riveting progress in the SBD Wing Center Section structure forward of Spar #2.
Craig Cunha is shown here riveting a rib to Spar #1 in partnership with Doug Brown, who is just visible if you look carefully through one of the ribs. Brown is pressing a bucking bar (sometimes called a dolly) against the rivet end during this operation, which forms the tail after four or five taps from the rivet gun in Cunha’s hands. At most locations along the spar, there is a matching rib on each side. As a consequence, the rivet gun must use an offset snap/set in order to provide sufficient clearance for the gun to drive the rivets without rubbing up against the rib. Likewise, an offset or angled bucking bar is used to form the rivet tails. (image via Pioneer Aero Ltd.)
This image of the lefthand wheel well was captured soon after the ribs linking the Nose Spar to Spar #1 had been riveted to Spar #1. The rivets attaching the skin, however, had yet to be installed. (image via Pioneer Aero Ltd.)
This topside view of the lefthand wheel well shows the rear face of Spar #1. Freshly installed rivets are visible in the forward flanges of the ribs linking it to Spar #2. Rivets in the spar cap above the wheel cut out in the spar’s web section are in the process of being installed. (image via Pioneer Aero Ltd.)
In this view of the righthand wheel well, the ribs linking the nose spar to Spar #1 ribs had been riveted to the forward face of Spar #1 at the time this image was captured, although the rivets attaching the wing skin to these ribs had yet to be driven. (image via Pioneer Aero Ltd.)
In this view from the top side of the lefthand wheel well, the ribs linking the nose spar to Spar #1 were in the process of being riveted to the overlying skin. The aft pair of rivets for each rib had yet to be installed, as indicated by the clecoes holding the skin down. (image via Pioneer Aero Ltd.)
Lower Forward Fuselage:
Once Cunha and Brown had riveted the leading edges and forward ribs to Spar #1, fixing everything in place, it was possible to release the clecos pinning the lower forward fuselage structure and its associated fairings to the Wing Center Section. This provided them the ability to rivet certain components to this fuselage structure (like the leading edge fairings) with the subassembly sat atop a work bench, a task which would have been impossible to accomplish with the parts still mounted to the jig itself due to the extreme access limitations.
Here we see the forward lower lefthand wing root fairing after it has been permanently fixed to the lower section of Fuselage Frame #1. As with riveting the fairing together, this task also took place on the work bench due to the non-existent bucking bar access once the fuselage frame and its associated structure are mounted on the Wing Center Section. Note that, in addition to rivets, three screws also help fasten the fairing to Fuselage Frame #1. The screws (cinched against anchor nuts on the fuselage frame) were necessary here because the spent cartridge port fitting cuts off any access for bucking conventional rivets. (image via Pioneer Aero Ltd.)
The lower forward fuselage structure, which includes Fuselage Frame #1, is seen here having been refitted onto the SBD’s Wing Center Section jig for the final time as a separate subassembly. Efforts have already begun to fasten it to the surrounding structure. Indeed, here we can see that the righthand lower forward wing root fairing has been riveted to the leading edge skin and the forward wheel well surround. The surround has also been riveted in place. (image via Pioneer Aero Ltd.)
As with the opposite side, here we see the lefthand lower forward wing root fairing has been riveted to the SBD’s leading edge skin and the forward wheel well surround. The surround has also been riveted in place. The Cleco's in the corners of the wing root fairing remain in place for now, as that is where the next skin section will be riveted in place. (image via Pioneer Aero Ltd.)
Here we see Pioneer Aero’s Craig Cunha lying in a deeply uncomfortable position as he rivets the forward flanges of the bomb displacement support ribs to the lower section of Fuselage Frame #1; Doug Brown is on the opposite side of the wing forming up the rivet tails with a bucking bar. (image via Pioneer Aero Ltd.)
Here Doug Brown is sitting in an equally uncomfortable position to his fellow engineer, Craig Cunha, as the two of them rivet on the forward flanges of the bomb displacement support ribs to the lower section of Fuselage Frame #1. Brown is forming the rivet tails while Cunha, lying on the opposite side of the wing, is operating a rivet gun.(image via Pioneer Aero Ltd.)
Preparation & Painting:
With everything forwards of Spar #2 riveted together as far as possible, it was time to remove Spar #2 and all of the structure to its rear to begin preparing and painting the parts for final assembly on the Wing Center Section jig. The following images show some of the steps involved in this effort.
The exterior face of the lower skin panel which extends between Spars #2 and #3 is seen here under preparation for primer-painting and a layer pf “zinc-chromate”. The prep work includes removing the protective plastic covering, trimming the edges and access holes to their final shapes, de-burring every hole and edge, countersinking or dimpling any holes which will be occupied by countersunk rivets, removing any ink and cleaning the surfaces chemically. Siting beside the remanufactured skin panel is the original top skin panel which straddled Spars #2 and #3. (image via Pioneer Aero Ltd.)
A closeup of the skin panel shown in the previous image featuring examples of two methods for creating countersunk holes. Note the two countersunk holes close to the skin’s lower edge; these represent 'cut countersinking' where material is removed using a specialized boring tool to create the correctly shaped hole (while simultaneously allowing the opposite side of the material to remain flat). Just above those two holes, we can see a 'dimpled' countersunk hole, where the skin has been deformed to the correct shape. For that variety, the cross-sectional profile is identical on each side of the skin. While easier to set up, and faster to create, this countersinking technique also requires that the structure which the dimpled skin mates up against must also have the same rivet hole cross-sectional profile, whether it be cut or dimpled, to allow the two parts to lie flush with one another. (image via Pioneer Aero Ltd.)
Lying on the saw horses is the freshly-painted upper skin panel (interior face) which spans the gap between Spars #2 and #3. It is seen here awaiting installation. (image via Pioneer Aero Ltd.)
In the foreground, we see a selection of Wing Center Section components following preparation and painting. The long piece at the top is the upper skin which lies between Spars #1 and #2, whilst those at the lower left form part of the lower skin between Spars #1 and #2. The white-painted items in the middle are the aft, inboard wheel well surrounds for both sides, whilst the curved green items to their right are the forward upper wing root fairings. (image via Pioneer Aero Ltd.)
Next Steps:
With the first sections of the SBD's Wing Center Section riveted back together and the remaining components being prepared for reassembly, it was also time to begin refabricating the plumbing for the hydraulic, fuel, electrical and indicating systems. This topic will be covered in a followup article coming soon!